PDA Technical Glossary
PDA Technical Reports are highly valued membership benefits because they offer expert guidance and opinions on important scientific and regulatory topics and are used as essential references by industry and regulatory authorities around the world. These reports include terms which explain the material and enhance the reader’s understanding.
The database presented here includes the glossary terms from all current technical reports. The database is searchable by keyword, topic, or by technical report. Each definition provided includes a link to the source technical report within the PDA Technical Report Portal.
(Please select "All" to restart a filtered Search)
Refine Results
Filter By Technical Report Number
Filter By Technical Report Keyword
Filter By Technical Report Category
Decommissioning
A planned and orderly removal of a facility, operation or system from use. (TR48)
The process of retiring equipment/systems/facilities from production use. (TR54-5)
Source:
Design Reviews
Planned and systematic reviews of specifications, design, and design development and continuous improvement changes performed as appropriate throughout the lifecycle of the manufacturing system. Design reviews evaluate deliverables against standards and requirements, identify problems, and propose required corrective actions. (TR54-5)
Source:
Design Specification
Controlled documentation that clearly and explicitly defines the manufacturing system details, codes, and standards to be followed during fabrication and construction to meet associated requirements. (TR54-5)