
PDA Technical Glossary
PDA Technical Reports are highly valued membership benefits because they offer expert guidance and opinions on important scientific and regulatory topics and are used as essential references by industry and regulatory authorities around the world. These reports include terms which explain the material and enhance the reader’s understanding.
The database presented here includes the glossary terms from all current technical reports. The database is searchable by keyword, topic, or by technical report. Each definition provided includes a link to the source technical report within the PDA Technical Report Portal.
(Please select "All" to restart a filtered Search)
Refine Results
Filter By Technical Report Number
- TR 1: Validation: Moist Heat (7)
- TR 3: Validation: Dry Heat (4)
- TR 64: Temp Controlled Systems Qualification (2)
- TR 14: Validation: Protein Purification Chromatography (2)
- TR 54-5: Quality Risk Management for the Design, Qualification, and Operation of Manufacturing Systems (2)
- TR 42: Validation: Protein Manufacturing (2)
- TR 51: Biological Indicators (1)
- TR 60: Process Validation (1)
- TR 60-3: Process Validation: A Lifecycle Approach: Bio Drug Sub Mfg (1)
- TR 30: Parametric Release (1)
- TR 39: Cold Chain (1)
- TR 45: Depth Filtration (1)
Filter By Technical Report Keyword
Filter By Technical Report Category
Cool-Down Phase
The phase of a sterilization cycle that occurs after completion of the exposure phase. Parameters of a cool-down phase are typically defined in order to meet applicable user requirements for load cooling and drying. (TR01) The phase of a sterilization cycle that occurs after completion of the exposure phase. [Synonym: post-conditioning phase, slow exhaust phase, drying phase, equalization phase] (TR48) The phase of an SIP cycle that occurs after completion of the exposure phase. Parameters (e.g., time, temperature, pressure) of a cool-down phase are typically defined in order to meet applicable user requirements for system cooling and drying. (TR61)
Source:
F-Value (Lethality Factor)
A measurement of sterilization effectiveness, the F-value is the calculated equivalent lethality (using a specified z-value), in terms of minutes at a reference temperature (Tref), delivered by a sterilization cycle. (TR1) (TR3) (TR30) (TR48) (TR61)
Source:
Gravity Displacement
A sterilization process based on the principle that cold air within the chamber is heavier than the steam entering and will sink to the bottom of the chamber. As steam enters the chamber, air is pushed out the bottom drain and exits, with the condensate, through a steam trap. (TR01) (TR48) (TR61)
Source:
Heat-up Phase
The phase of a sterilization cycle that occurs prior to the exposure phase. Process parameters are developed for this phase in order to meet applicable user requirements for load conditioning (e.g., air removal and preheating.) (TR01) (TR3) (TR48) (TR61)
Source:
Installation Qualification (IQ)
Documented verification that the equipment or systems, as installed or modified, comply with the approved design, the manufacturer’s recommendations, and/or user requirements. (TR14) (TR42) (TR48) (TR61) (TR64)
The documented verification that the facilities, systems and equipment, as installed or modified, comply with the approved design and the manufacturer’s recommendations. (TR54-5)
Documented verification that the equipment or systems, as installed or modified, comply with the approved design, the manufacturer’s recommendations, and/or user requirements (17). (TR60)
Source:
Operating Parameters (Key Parameters)
Values that are controlled and/or measured and are used to assure the ongoing “state of control” and consistency of runs. Failure to meet a key process parameter should result in an investigation with a documented rationale for the disposition of the load. (TR01) (TR3) (TR51) (TR48) Values that are controlled and/or measured and are used to assure the ongoing “state of control” of steam in place cycles. Failure to meet a key process parameter should result in an investigation. (TR61)
Source:
Performance Qualification (PQ)
Documented verification that the equipment and ancillary systems, as connected together, can perform effectively and reproducibly based on the approved process method and specifications. (TR3) (TR14) (TR45) (TR42) (TR48) (TR61) (TR64)
Transport tests of product or representative product that is conducted during actual transportation or distribution. (TR39)
Documented evidence that provides a high degree of assurance that the equipment and/or system functions accurately and consistently according to predetermined specifications in its operating environment. (TR54-5)
Documented verification that the equipment and ancillary systems, as connected together, can perform effectively and reproducibly based on the approved process method and specifications (17). (TR60-3)
Source:
Saturated Steam
Steam that is at a temperature and pressure that corresponds to the vaporization curve of water. It is in a state of equilibrium between being a liquid and a gas, with no entrained liquid water. [Synonym: Dry Saturated Steam] (TR01) (TR48) (TR61)
Source:
Steam: Pure Steam
Collected condensate that complies with the Compendial requirements for Water for Injecton (WFI). [Synonyms: clean steam, high quality steam] (TR01) (TR61) (TR48)