PDA Technical Glossary
PDA Technical Reports are highly valued membership benefits because they offer expert guidance and opinions on important scientific and regulatory topics and are used as essential references by industry and regulatory authorities around the world. These reports include terms which explain the material and enhance the reader’s understanding.
The database presented here includes the glossary terms from all current technical reports. The database is searchable by keyword, topic, or by technical report. Each definition provided includes a link to the source technical report within the PDA Technical Report Portal.
(Please select "All" to restart a filtered Search)
Refine Results
Filter By Technical Report Number
- TR 1: Validation: Moist Heat (11)
- TR 3: Validation: Dry Heat (7)
- TR 61: Steam in Place (5)
- TR 30: Parametric Release (4)
- TR 54-5: Quality Risk Management for the Design, Qualification, and Operation of Manufacturing Systems (4)
- TR 51: Biological Indicators (2)
- TR 60: Process Validation (2)
- TR 54: QRM:Manufacturing Operations (1)
- TR 64: Temp Controlled Systems Qualification (1)
- TR 14: Validation: Protein Purification Chromatography (1)
- TR 42: Validation: Protein Manufacturing (1)
Filter By Technical Report Keyword
Filter By Technical Report Category
Air Removal Test
A test used to evaluate air removal and steam penetration in an empty sterilizer that is used for porous/hard goods load sterilization (e.g., Bowie-Dick Test, DART, Lantor Cube, Browns’ Test). (TR01) (TR 48)
Source:
Chamber Leak Test
A test conducted to evaluate possible air infiltration to the chamber under vacuum. [Synonym: Vacuum Leak Test] (TR1) (TR48)
Source:
Commissioning
A well planned, documented and managed engineering approach to the start-up and transfer of facilities, systems and equipment to the end-user that results in a safe and functional environment that meets established design and user requirement specifications. Commissioning precedes Qualification and includes three phases:
1. Inspection, testing, and regulation
2. Adjustment and setting of work
3. Functional testing (TR 3)
A prescribed number of activities designed to take equipment and systems from a static, substantially complete state to an operable state. (TR 48)
A well planned, documented, managed engineering approach to the start-up and turnover of facilities, systems, and equipment to the end-user, that results in a safe and functional environment that meets established design requirements and stakeholder expectations.(TR 54) (TR 54-5)
Source:
Cycle Phases
A discrete series of sterilizer process steps (such as, heat-up, exposure and cool-down) performed sequentially that represent a complete sterilization cycle. (TR48)
Source:
Decommissioning
A planned and orderly removal of a facility, operation or system from use. (TR48)
The process of retiring equipment/systems/facilities from production use. (TR54-5)
Source:
Electronic Record
A record used for GMP purposes or for regulatory submission that is stored electronically for the purposes of reproduction, retrieval or archival. (TR48)
Source:
F-Value (Lethality Factor)
A measurement of sterilization effectiveness, the F-value is the calculated equivalent lethality (using a specified z-value), in terms of minutes at a reference temperature (Tref), delivered by a sterilization cycle. (TR1) (TR3) (TR30) (TR48) (TR61)
Source:
Good Engineering Practice (GEP)
Documented proven and accepted engineering methods and practices that applied throughout the project life-cycle to deliver solutions that are cost effective, are compliant with regulations and meet the requirements of the user. (TR48)
Those established engineering methods and standards that are applied throughout the lifecycle to deliver appropriate and cost-effective solutions. (TR60) (TR54-5)
Source:
Installation Qualification (IQ)
Documented verification that the equipment or systems, as installed or modified, comply with the approved design, the manufacturer’s recommendations, and/or user requirements. (TR14) (TR42) (TR48) (TR61) (TR64)
The documented verification that the facilities, systems and equipment, as installed or modified, comply with the approved design and the manufacturer’s recommendations. (TR54-5)
Documented verification that the equipment or systems, as installed or modified, comply with the approved design, the manufacturer’s recommendations, and/or user requirements (17). (TR60)
Source:
Liquid Load
A load consisting of closed containers of aqueous liquids. The sterilization of the container contents is achieved through transfer of energy through the container into the aqueous liquid. (TR01) (TR30) (TR48)
Source:
Load Zone
Area within the sterilization chamber where materials to be sterilized may be placed. (TR01) (TR3) (TR48)
Source:
Maximum Load
The maximum quantity or mass of items permitted in a sterilizer load. (TR01) The maximum quantity or mass of items permitted in a depyrogenation or sterilization load. (TR3) The maximum quantity or mass of products permitted in a validated sterilizer load. (TR30)The maximum quantity or mass of items permitted in a sterilizer load. (TR48)
Source:
Operating Parameters (Critical Parameters)
Values that are controlled and/or measured and are linked to safety and efficacy of a product or the process. Failure to meet a critical parameter should result in rejection of the load. (TR01) (TR3) (TR48) (TR51)
Source:
Operating Parameters (Key Parameters)
Values that are controlled and/or measured and are used to assure the ongoing “state of control” and consistency of runs. Failure to meet a key process parameter should result in an investigation with a documented rationale for the disposition of the load. (TR01) (TR3) (TR51) (TR48) Values that are controlled and/or measured and are used to assure the ongoing “state of control” of steam in place cycles. Failure to meet a key process parameter should result in an investigation. (TR61)
Source:
Saturated Steam
Steam that is at a temperature and pressure that corresponds to the vaporization curve of water. It is in a state of equilibrium between being a liquid and a gas, with no entrained liquid water. [Synonym: Dry Saturated Steam] (TR01) (TR48) (TR61)
Source:
Site Acceptance Testing
The SAT is a series of tests that are performed as part of commissioning after the unit has been installed in the final location. (TR48)
Source:
Steam: Plant Steam
Steam of undefined chemical or biological quality produced from a boiler, usually containing boiler additives, without further treatment. [Synonym: Factory Steam, House Steam, Industrial Steam] (TR48)
Source:
Steam: Process Steam
Process steam is similar to plant steam, except the steam is generated using a controlled feed water source to which no volatile additives (amines or hydrazines) have been introduced. Process steam may be appropriate for moist heat sterilization of liquid loads where the containers are filled and sealed prior to sterilization. (TR48)
Source:
Steam: Pure Steam
Collected condensate that complies with the Compendial requirements for Water for Injecton (WFI). [Synonyms: clean steam, high quality steam] (TR01) (TR61) (TR48)
Source:
Sterilization Cycle
A sequence of defined operating parameters (e.g., time, temperature and pressure) and conditions required to render an item sterile. (TR01) (TR30) (TR48) A sequence of defined operating parameters (e.g., time and temperature) required to render an item sterile. (TR3)
Source:
Sterilizer Specification
Documents that define sterilizer system attributes and how they should be met. (TR48)
Source:
Sterilizer Specification (Design Specification (DS))
A set of specifications and information related to the installation features including equipment, hardware and software) of the system that will ensure the realization of the user requirements. [Synonym: Detailed Design Specification (DDS] (TR48)
Source:
Sterilizer Specification (User Requirement Specification (URS))
A description of features and performance requirements of a system that will fulfill the needs of the end user. (TR48)