PDA Technical Glossary

PDA Technical Glossary

PDA Technical Reports are highly valued membership benefits because they offer expert guidance and opinions on important scientific and regulatory topics and are used as essential references by industry and regulatory authorities around the world. These reports include terms which explain the material and enhance the reader’s understanding.

The database presented here includes the glossary terms from all current technical reports. The database is searchable by keyword, topic, or by technical report. Each definition provided includes a link to the source technical report within the  PDA Technical Report Portal.

(Please select "All" to restart a filtered Search)

  • All
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • A
  • B
  • C
  • D
  • E
  • F
  • G
  • H
  • I
  • J
  • K
  • L
  • M
  • N
  • O
  • P
  • Q
  • R
  • S
  • T
  • U
  • V
  • W
  • X
  • Y
  • Z
Air Removal Test
A test used to evaluate air removal and steam penetration in an empty sterilizer that is used for porous/hard goods load sterilization (e.g., Bowie-Dick Test, DART, Lantor Cube, Browns’ Test). (TR01) (TR 48)
Source:
Chamber Leak Test
A test conducted to evaluate possible air infiltration to the chamber under vacuum. [Synonym: Vacuum Leak Test] (TR1) (TR48)
Source:
Commissioning
A well planned, documented and managed engineering approach to the start-up and transfer of facilities, systems and equipment to the end-user that results in a safe and functional environment that meets established design and user requirement specifications. Commissioning precedes Qualification and includes three phases: 1. Inspection, testing, and regulation 2. Adjustment and setting of work 3. Functional testing (TR 3) A prescribed number of activities designed to take equipment and systems from a static, substantially complete state to an operable state. (TR 48) A well planned, documented, managed engineering approach to the start-up and turnover of facilities, systems, and equipment to the end-user, that results in a safe and functional environment that meets established design requirements and stakeholder expectations.(TR 54) (TR 54-5)
Source:
Cool-Down Phase
The phase of a sterilization cycle that occurs after completion of the exposure phase. Parameters of a cool-down phase are typically defined in order to meet applicable user requirements for load cooling and drying. (TR01) The phase of a sterilization cycle that occurs after completion of the exposure phase. [Synonym: post-conditioning phase, slow exhaust phase, drying phase, equalization phase] (TR48) The phase of an SIP cycle that occurs after completion of the exposure phase. Parameters (e.g., time, temperature, pressure) of a cool-down phase are typically defined in order to meet applicable user requirements for system cooling and drying. (TR61)
Source:
Cycle Phases
A discrete series of sterilizer process steps (such as, heat-up, exposure and cool-down) performed sequentially that represent a complete sterilization cycle. (TR48)
Source:
Decommissioning
A planned and orderly removal of a facility, operation or system from use. (TR48) The process of retiring equipment/systems/facili­ties from production use. (TR54-5)
Source:
Dryness Fraction
An absolute measure of the actual latent heat of a sample of steam relative to the theoretical latent heat of saturated steam. (TR01) (TR48)
Source:
Good Engineering Practice (GEP)
Documented proven and accepted engineering methods and practices that applied throughout the project life-cycle to deliver solutions that are cost effective, are compliant with regulations and meet the requirements of the user. (TR48) Those established engineering methods and standards that are applied throughout the lifecycle to deliver appropriate and cost-effective solutions. (TR60) (TR54-5)
Source:
Operating Parameters (Critical Parameters)
Values that are controlled and/or measured and are linked to safety and efficacy of a product or the process. Failure to meet a critical parameter should result in rejection of the load. (TR01) (TR3) (TR48) (TR51)
Source:
Operating Parameters (Key Parameters)
Values that are controlled and/or measured and are used to assure the ongoing “state of control” and consistency of runs. Failure to meet a key process parameter should result in an investigation with a documented rationale for the disposition of the load. (TR01) (TR3) (TR51) (TR48) Values that are controlled and/or measured and are used to assure the ongoing “state of control” of steam in place cycles. Failure to meet a key process parameter should result in an investigation. (TR61)
Source:
Piping and Instrumentation Diagram (P&ID)
A schematic diagram that shows the relational arrangement of piping, components, instruments, and equipment connections of the system. It also illustrates the control and functional relationship. (TR48)
Source:
Programmable Logic Controller (PLC)
A digital electronic apparatus with a programmable memory for storing instructions to implement specific functions, such as logic, sequencing, timing, counting and arithmetic, to control machines and processes. (TR48)
Source:
Resistance Temperature Detector(s) (RTDs)
Resistance temperature detectors are temperature sensors in which the electrical resistance in the element increases with increases in temperature. This electrical resistance is then translated into a temperature value (expressed as a resistance versus temperature curve). (TR48)
Source:
Site Acceptance Testing
The SAT is a series of tests that are performed as part of commissioning after the unit has been installed in the final location. (TR48)
Source:
Sterilization Cycle
A sequence of defined operating parameters (e.g., time, temperature and pressure) and conditions required to render an item sterile. (TR01) (TR30) (TR48) A sequence of defined operating parameters (e.g., time and temperature) required to render an item sterile. (TR3)
Source:
Sterilizer Specification
Documents that define sterilizer system attributes and how they should be met. (TR48)
Source:
Sterilizer Specification (Design Specification (DS))
A set of specifications and information related to the installation features including equipment, hardware and software) of the system that will ensure the realization of the user requirements. [Synonym: Detailed Design Specification (DDS] (TR48)
Source:
Sterilizer Specification (User Requirement Specification (URS))
A description of features and performance requirements of a system that will fulfill the needs of the end user. (TR48)
Source: