PDA Technical Glossary

PDA Technical Glossary

PDA Technical Reports are highly valued membership benefits because they offer expert guidance and opinions on important scientific and regulatory topics and are used as essential references by industry and regulatory authorities around the world. These reports include terms which explain the material and enhance the reader’s understanding.

The database presented here includes the glossary terms from all current technical reports. The database is searchable by keyword, topic, or by technical report. Each definition provided includes a link to the source technical report within the  PDA Technical Report Portal.

(Please select "All" to restart a filtered Search)

  • All
  • 0
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • A
  • B
  • C
  • D
  • E
  • F
  • G
  • H
  • I
  • J
  • K
  • L
  • M
  • N
  • O
  • P
  • Q
  • R
  • S
  • T
  • U
  • V
  • W
  • X
  • Y
  • Z
Change Management
Changeover
The steps taken for switching multiproduct equipment from the manufacture of one product to the manufacture of a different product. (TR29) (TR49)
Source:
Defect
(1) A departure of a quality characteristic from its intended level or state that occurs with a severity sufficient to cause an associated product or service not to satisfy its intended normal or foreseeable usage requirements. (TR51) (2) The nonfulfillment of intended usage requirements. The departure or absence of one or more quality characteristics from intended usage requirements. (TR43)
Source:
Master Seed Stock
Reference culture of a microorganism derived from an authenticated source such as American Type Culture Collection (ATCC) and used to produce working seed lots. (TR51)
Source:
Operating Parameters (Critical Parameters)
Values that are controlled and/or measured and are linked to safety and efficacy of a product or the process. Failure to meet a critical parameter should result in rejection of the load. (TR01) (TR3) (TR48) (TR51)
Source:
Operating Parameters (Key Parameters)
Values that are controlled and/or measured and are used to assure the ongoing “state of control” and consistency of runs. Failure to meet a key process parameter should result in an investigation with a documented rationale for the disposition of the load. (TR01) (TR3) (TR51) (TR48) Values that are controlled and/or measured and are used to assure the ongoing “state of control” of steam in place cycles. Failure to meet a key process parameter should result in an investigation. (TR61)
Source:
Working Seed Lot
A seed lot generated from the master seed stock by a single passage. (TR51)
Source: